Architectural Overview

Posted on February 17, 2008

1


It’s about time I put things down on paper and see what’s missing.

I’ve written a high-level requirement specification of the whole system (click for PDF).

It outlines my approach in 3 phases (Motor Development, Parallel HEV, Serial HEV) as well as the layout of the electric system for each phase.

Comments?

Advertisements
Posted in: Add-On-HEV, Strategy